Vertical Power Connectors

Results: 1 735
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Product Type Product Current Rating Number of Positions Maximum Operating Temperature IP Rating Tradename
Molex Heavy Duty Power Connectors SCPC PWR CONN TOR 12AWG BLUE COVER Non-Stocked Lead-Time 11 Weeks
Min.: 1
Mult.: 1

Heavy Duty Power Connectors Connectors 20 A 2 Position + 85 C SCPC
Molex Power to the Board MiniFit HCS Vt Hdr DR V-2 6Ckt Non-Stocked Lead-Time 3 Weeks
Min.: 1
Mult.: 1

Power to the Board 11 A 6 Position + 105 C Mini-Fit HCS
TE Connectivity Power to the Board GHC 9.0 3POS HDR ASSY RED Non-Stocked Lead-Time 8 Weeks
Min.: 3 168
Mult.: 3 168

Power to the Board Headers 20 A 3 Position + 105 C


TE Connectivity / AMP Power to the Board UPME REC 1X009P VRT BACKPLANE Non-Stocked Lead-Time 9 Weeks
Min.: 1 470
Mult.: 1 470

Power to the Board 16 A 9 Power


TE Connectivity / AMP Power to the Board CONNECTOR ASSEMBLY, SEC II POWER, DUAL P Non-Stocked Lead-Time 7 Weeks
Min.: 6 000
Mult.: 6 000

Power to the Board 22 A 8 Power, 22 Signal
TE Connectivity Heavy Duty Power Connectors 5mm B-T-W Conn. 4P(2row) HDR A Non-Stocked Lead-Time 6 Weeks
Min.: 4 000
Mult.: 4 000

Heavy Duty Power Connectors Connectors 9 A 4 Position + 105 C
TE Connectivity / AMP Power to the Board UPM EXPANDED RECEPT ASSEMB Non-Stocked Lead-Time 10 Weeks
Min.: 1 085
Mult.: 1 085

Power to the Board 6 Position
TE Connectivity / AMP Power to the Board 1/2 SIZE DWR HDR - ACTION PIN Non-Stocked Lead-Time 11 Weeks
Min.: 90
Mult.: 90

Power to the Board
HARTING Heavy Duty Power Connectors HAN 16B SNG LOCK LEV METAL HSG
Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Heavy Duty Power Connectors Connectors IP65 Han
HARTING Heavy Duty Power Connectors SURFACE MOUNTING HSG 1 SIDE ENTRY
Non-Stocked Lead-Time 8 Weeks
Min.: 1
Mult.: 1

Heavy Duty Power Connectors Connectors IP65 Han
HARTING Heavy Duty Power Connectors Housing Size 30 Bulkhead Mt w fstnrs
Lead-Time 6 Weeks
Min.: 1
Mult.: 1

Heavy Duty Power Connectors Connectors IP65, IP67 Han
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 720
Mult.: 360
Power to the Board Receptacles 49 A, 75 A 3 Power, 24 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 504
Mult.: 504

Power to the Board Receptacles 49 A, 75 A 3 Position + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EGF-PWRBLADE+ HDR. VTL GENERIC Non-Stocked Lead-Time 12 Weeks
Min.: 660
Mult.: 165

Power to the Board Plugs 49 A, 75 A 4 Power, 12 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 720
Mult.: 720

Power to the Board Receptacles 49 A, 75 A 2 Position + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 360
Mult.: 360

Power to the Board Receptacles 49 A, 75 A 4 Power, 12 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 432
Mult.: 216

Power to the Board Receptacles 49 A, 75 A 7 Power, 24 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board PWRBLADE+ VH STB-10106136-8004001LF Non-Stocked Lead-Time 12 Weeks
Min.: 264
Mult.: 132
Power to the Board Plugs 49 A, 75 A 8 Power, 16 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board PWRBLADE+ VH STB-10106266-4002001LF Non-Stocked Lead-Time 12 Weeks
Min.: 1 188
Mult.: 99
Power to the Board Plugs 49 A, 75 A 4 Power, 8 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board PWRBLADE+ VH PF-10106267-1C03002LF Non-Stocked Lead-Time 12 Weeks
Min.: 1 782
Mult.: 99
Power to the Board Plugs 49 A, 75 A 13 Power, 12 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board 552-5EHF-PWRBLADE+ REC VTL GENERIC Non-Stocked Lead-Time 10 Weeks
Min.: 216
Mult.: 216
Power to the Board Receptacles 49 A, 75 A 13 Power, 12 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board 10127820-0421BPCLF-MTK 4.2 DR 04P VT HDR Non-Stocked Lead-Time 12 Weeks
Min.: 2 000
Mult.: 500
: 500
Power to the Board Connectors 9 A 4 Position + 105 C Minitek
Amphenol FCI Power to the Board PWRBLADE+ V/T HDR STB Non-Stocked Lead-Time 12 Weeks
Min.: 792
Mult.: 132
Power to the Board Headers 49 A, 75 A 4 Power, 32 Signal + 125 C PwrBlade+
Amphenol FCI Power to the Board PWRBLADE+ V/T HDR STB Non-Stocked Lead-Time 12 Weeks
Min.: 990
Mult.: 165
Power to the Board Plugs 49 A, 75 A 5 Position + 125 C PwrBlade+
Amphenol FCI Power to the Board PWRBLADE+V/T HDR STB Non-Stocked Lead-Time 12 Weeks
Min.: 792
Mult.: 132
Power to the Board Plugs 49 A, 75 A 5 Power, 16 Signal + 125 C PwrBlade+