318 Mounting Fixings

Results: 28
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS ECAD Model Product Type Material Mounting Hole Size Length Outside Diameter Inside Diameter Thread Size Maximum Temperature
PEM Mounting Fixings Non-Stocked Lead-Time 20 Weeks
Min.: 10 000
Mult.: 250

18 mm
PEM VM20BSO-3.5M3-18ZI
PEM Mounting Fixings Non-Stocked Lead-Time 20 Weeks
Min.: 10 000
Mult.: 250

Banner Engineering Mounting Fixings Bracket: Right-Angle Mounting; Material: Stainless Steel; Hardware included Non-Stocked Lead-Time 5 Weeks
Min.: 1
Mult.: 1
Brackets Right Angle Mount Bracket Stainless Steel