5.5 V Semiconductors

Results: 640
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Monolithic Power Systems (MPS) LED Lighting Driver ICs 3 Channels, Charge Pump RGB LED Driver Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5 000

Monolithic Power Systems (MPS) Switching Voltage Regulators 10A 22V Hi Effc.Sync Step Down Converter Non-Stocked Lead-Time 71 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Switching Voltage Regulators 10A 22V Hi Effc.Sync Step Down Converter Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 5 000

Monolithic Power Systems (MPS) Switching Voltage Regulators 16 V,12 A, Synchronous Buck with Adjustable Current Limit,Programmable Fsw, and Voltage Tracking Non-Stocked Lead-Time 64 Weeks
Min.: 1
Mult.: 1
: 500

Monolithic Power Systems (MPS) Switching Voltage Regulators 16 V,12 A, Synchronous Buck with Adjustable Current Limit,Programmable Fsw, and Voltage Tracking Non-Stocked Lead-Time 57 Weeks
Min.: 1
Mult.: 1
: 5 000

Diodes Incorporated 74LVC2G02HK3-7
Diodes Incorporated Logic Gates Logic LVC 2 Gate Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 5 000

Diodes Incorporated 74LVC2G32HK3-7
Diodes Incorporated Logic Gates Logic LVC 2 Gate Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 5 000

Diodes Incorporated 74LVC2G38HK3-7
Diodes Incorporated Logic Gates Logic LVC 2 Gate Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 5 000

Diodes Incorporated 74LVC2G38RA3-7
Diodes Incorporated Logic Gates Logic LVC 2 Gate Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 5 000

Texas Instruments Battery Management Comp CEDV Fuel Gauge Batt Mgmt Cntrlr A A 595-BQ78350DBT-R1 Non-Stocked Lead-Time 26 Weeks
Min.: 1
Mult.: 1

Texas Instruments Switching Controllers 70A Synchronous Buck NexFET Smart Power Non-Stocked Lead-Time 16 Weeks
Min.: 250
Mult.: 250
: 250

Texas Instruments Switching Controllers 40A SynchEvalMod Buc k NexFET A 595-CSD9 Non-Stocked Lead-Time 16 Weeks
Min.: 250
Mult.: 250
: 250

Texas Instruments Switching Controllers 60A SynchEvalMod Buc k NexFET A 595-CSD9 Non-Stocked Lead-Time 16 Weeks
Min.: 2 500
Mult.: 2 500
: 2 500

Texas Instruments Switching Controllers 60A SynchEvalMod Buc k NexFET A 595-CSD9 Non-Stocked Lead-Time 16 Weeks
Min.: 1
Mult.: 1
: 250


ABLIC LDO Voltage Regulators Linear LDO regulator 30uA Iq 180mA Iout Non-Stocked Lead-Time 16 Weeks
Min.: 3 000
Mult.: 3 000
: 3 000

ABLIC LDO Voltage Regulators Linear LDO Regulator 30uA Iq 180mA Iout Non-Stocked Lead-Time 16 Weeks
Min.: 1 000
Mult.: 1 000
: 1 000


ABLIC Switching Controllers Step-Up SWR PFM 100kHz 23.2uA Iq Non-Stocked Lead-Time 16 Weeks
Min.: 3 000
Mult.: 3 000
: 3 000


ABLIC Switching Voltage Regulators Step Up Charge Pump Non-Stocked Lead-Time 16 Weeks
Min.: 3 000
Mult.: 3 000
: 3 000


ABLIC Switching Voltage Regulators Step Up Charge Pump Non-Stocked Lead-Time 16 Weeks
Min.: 3 000
Mult.: 3 000
: 3 000

Texas Instruments Board Mount Hall Effect/Magnetic Sensors Low-tolerance high-s ensitivity in-plane Non-Stocked Lead-Time 16 Weeks
Min.: 3 000
Mult.: 3 000
: 3 000
No
ABLIC LDO Voltage Regulators Non-Stocked Lead-Time 24 Weeks
Min.: 4 000
Mult.: 4 000
: 4 000

ABLIC LDO Voltage Regulators Non-Stocked Lead-Time 24 Weeks
Min.: 4 000
Mult.: 4 000
: 4 000

ABLIC LDO Voltage Regulators Non-Stocked Lead-Time 24 Weeks
Min.: 4 000
Mult.: 4 000
: 4 000

ABLIC LDO Voltage Regulators Non-Stocked Lead-Time 24 Weeks
Min.: 4 000
Mult.: 4 000
: 4 000

ABLIC LDO Voltage Regulators Non-Stocked Lead-Time 24 Weeks
Min.: 4 000
Mult.: 4 000
: 4 000