Through Hole Semiconductors

Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS
Diodes Incorporated Board Mount Hall Effect/Magnetic Sensors HV Hall Effect Latch 3 to 28V 8kV 3mA Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Diodes Incorporated Board Mount Hall Effect/Magnetic Sensors HV Hall Effect Latch Pull-up 32Vdd -0.3V Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1
: 4 000

Vishay Semiconductors Bridge Rectifiers 35A,600V,LOWVF,INLINEBRIDGE Non-Stocked Lead-Time 7 Weeks
Min.: 1 200
Mult.: 1 200

Vishay Semiconductors Bridge Rectifiers 40A,600V,LOWVF,INLINEBRIDGE Non-Stocked Lead-Time 7 Weeks
Min.: 1 200
Mult.: 1 200

Vishay Semiconductors Bridge Rectifiers 1600 Volt 70 Amp Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Coilcraft Inductor Kits & Accessories Leaded Low Pass LC Filters Non-Stocked Lead-Time 2 Weeks
Min.: 1
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors Latch & Switch
Non-Stocked Lead-Time 2 Weeks
Min.: 100
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors 2-wire switch int CAP Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V
Non-Stocked Lead-Time 12 Weeks
Min.: 5 000
Mult.: 5 000

Melexis Board Mount Hall Effect/Magnetic Sensors 2-wire switch int CAP Bop/Brp: pre-Progr Latch TC = pre-Progr Vdd= 2.7 - 24V
Non-Stocked Lead-Time 12 Weeks
Min.: 5 000
Mult.: 5 000

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 1 800
Mult.: 15

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 1 800
Mult.: 15

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 1 800
Mult.: 15

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 2 000
Mult.: 20

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 2 000
Mult.: 20

Panjit Bridge Rectifiers 800V With High Tj Ultra Low VF Bridge Rectifier Non-Stocked Lead-Time 14 Weeks
Min.: 2 000
Mult.: 20

Allegro MicroSystems Board Mount Hall Effect/Magnetic Sensors PROGRAMMABLE HALL EFFECT SWITCH Non-Stocked Lead-Time 24 Weeks
Min.: 12 000
Mult.: 12 000
: 4 000

Allegro MicroSystems Board Mount Hall Effect/Magnetic Sensors Chopper-Stabilized, Precision Hall-Effect Switch for APS11202 Automotive, Consumer, and Industrial Applications Non-Stocked
Min.: 4 000
Mult.: 4 000

Allegro MicroSystems Board Mount Hall Effect/Magnetic Sensors ASIL-A SWITCH Non-Stocked Lead-Time 24 Weeks
Min.: 12 000
Mult.: 12 000
: 4 000
Allegro MicroSystems Board Mount Hall Effect/Magnetic Sensors Chopper-Stabilized, Precision Hall-Effect Latches for APS11202 Automotive, Consumer, and Industrial Applications Non-Stocked Lead-Time 18 Weeks
Min.: 4 000
Mult.: 4 000

Allegro MicroSystems Board Mount Hall Effect/Magnetic Sensors GENERAL PURPOSE HALL EFFECT LATCH Non-Stocked Lead-Time 24 Weeks
Min.: 1
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors 3 wire Latch Non-Stocked Lead-Time 14 Weeks
Min.: 5 000
Mult.: 5 000

Melexis Board Mount Hall Effect/Magnetic Sensors Programmable Linear Hall ICs (Gen. II) Lead-Time 21 Weeks
Min.: 1
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors Programmable Linear Hall ICs (Gen. II) Lead-Time 21 Weeks
Min.: 1
Mult.: 1

Melexis Board Mount Hall Effect/Magnetic Sensors Programmable Linear Hall ICs (Gen. II)
Non-Stocked Lead-Time 21 Weeks
Min.: 5 000
Mult.: 5 000

Melexis Board Mount Hall Effect/Magnetic Sensors Programmable Linear Hall ICs (Gen. II)
Non-Stocked Lead-Time 21 Weeks
Min.: 5 000
Mult.: 5 000