|
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-2.0M
- TAB62446501-020
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62446501-020
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-2.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12, Right Angle
|
2 Position
|
Pigtail
|
|
2 m (6.562 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-4.0M
- TAB62446501-040
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62446501-040
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-4.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12, Right Angle
|
2 Position
|
Pigtail
|
|
4 m (13.123 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-6.0M
- TAB62446501-060
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62446501-060
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-6.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12, Right Angle
|
2 Position
|
Pigtail
|
|
6 m (19.685 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-8.0M
- TAB62446501-080
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62446501-080
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-8.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12, Right Angle
|
2 Position
|
Pigtail
|
|
8 m (26.247 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-15.0M
- TAB62446501-150
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62446501-150
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-FR-PUR TORSION-15.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12, Right Angle
|
2 Position
|
Pigtail
|
|
15 m (49.213 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-0.5M
- TAB62535501-001
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-001
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-0.5M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
500 mm (19.685 in)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-1.0M
- TAB62535501-002
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-002
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-1.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
1 m (3.281 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-10M
- TAB62535501-007
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-007
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-10M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
10 m (32.808 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-2.0M
- TAB62535501-020
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-020
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-2.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
2 m (6.562 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-6.0M
- TAB62535501-060
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-060
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-6.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
6 m (19.685 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-15M
- TAB62535501-150
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62535501-150
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR-15M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
15 m (49.213 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-1.0M
- TAB62546501-002
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-002
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-1.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
1 m (3.281 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-10.0M
- TAB62546501-007
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-007
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-10.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
10 m (32.808 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-4.0M
- TAB62546501-040
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-040
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-4.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
4 m (13.123 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-6.0M
- TAB62546501-060
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-060
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-6.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
6 m (19.685 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-8.0M
- TAB62546501-080
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-080
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-8.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
8 m (26.247 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-15.0M
- TAB62546501-150
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62546501-150
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FS-PUR TORSION-15.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12
|
2 Position
|
15 m (49.213 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-0.5M
- TAB62635501-001
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-001
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-0.5M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
500 mm (19.685 in)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-1.0M
- TAB62635501-002
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-002
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-1.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
1 m (3.281 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-10M
- TAB62635501-007
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-007
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-10M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
10 m (32.808 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-2.0M
- TAB62635501-020
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-020
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-2.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
2 m (6.562 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-4.0M
- TAB62635501-040
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-040
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-4.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
4 m (13.123 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-6.0M
- TAB62635501-060
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-060
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-6.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
6 m (19.685 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-8.0M
- TAB62635501-080
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-080
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-8.0M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
8 m (26.247 ft)
|
250 V
|
|
|
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-15M
- TAB62635501-150
- TE Connectivity
-
Non-Stocked Lead-Time 21 Weeks
|
Mouser Part No
571-TAB62635501-150
|
TE Connectivity
|
Sensor Cables / Actuator Cables M12B2-MS-FR-PUR-15M
|
|
Non-Stocked Lead-Time 21 Weeks
|
|
|
|
M12
|
2 Position
|
M12, Right Angle
|
2 Position
|
15 m (49.213 ft)
|
250 V
|
|