Off-Board Charger Sub-Unit Power Converters

Littelfuse Off-Board Charger Sub-Unit Power Converters are required for DC charging stations capable of charging to 80% SOC in under 30 minutes. These fast-charging applications require modular power converters, which can be paralleled to cater to different power levels, thereby enabling fast charging. The most critical parameters are energy density and system efficiency. A sub-unit power converter in a DC charging station consists of an AC/DC power stage and DC/DC power stage integrated into the charging station.

Types of Thyristors

Change category view
Results: 114
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Product Type Mounting Style Package/Case Qualification
Littelfuse SCRs 40A 800V Non-Stocked Lead-Time 12 Weeks
Min.: 500
Mult.: 500
Reel: 500

SCRs SMD/SMT SMTO-263-2
Littelfuse SCRs 40A 800V Non-Stocked Lead-Time 12 Weeks
Min.: 1 000
Mult.: 1 000

SCRs SMD/SMT SMTO-263-2
Littelfuse SCRs 40A 1000V Non-Stocked Lead-Time 12 Weeks
Min.: 500
Mult.: 500
Reel: 500

SCRs SMD/SMT SMTO-263-2
Littelfuse SCRs 400V .8A 12uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 400V .8A 50uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 400V .8A 500uA Non-Stocked Lead-Time 15 Weeks
Min.: 1
Mult.: 1
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 400V .8A 500uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 400V .8A 500uA Non-Stocked Lead-Time 15 Weeks
Min.: 1
Mult.: 1
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 12uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 12uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 50uA Sensing Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 50uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 500uA Sensing Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs .8A 500A 600V Sen SCR Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs TO-92
Littelfuse SCRs 600V .8A 200uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 600V .8A 200uA Non-Stocked Lead-Time 15 Weeks
Min.: 2 000
Mult.: 2 000
Reel: 2 000

SCRs Through Hole TO-92
Littelfuse SCRs 400V 40A 30-45mA AEC-Q101 Non-Stocked
Min.: 500
Mult.: 500

SCRs Through Hole TO-220 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 58V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 500
Mult.: 500

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 58V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 200

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 65V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 500
Mult.: 500

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 65V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 200

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 75V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 500
Mult.: 500

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 75V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 200

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 90V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 500
Mult.: 500

TSPDs SMD/SMT TO-262M-2 AEC-Q101
Littelfuse Thyristor Surge Protection Devices - TSPD 90V 3kA BI TO262M AEC-Q101 Non-Stocked Lead-Time 15 Weeks
Min.: 200
Mult.: 200

TSPDs SMD/SMT TO-262M-2 AEC-Q101