Phoenix Contact Push-In Power Distribution Blocks

Results: 894
Select Image Part # Mfr. Description Datasheet Availability Pricing (EUR) Filter the results in the table by unit price based on your quantity. Qty. RoHS Type Number of Positions Current Rating Voltage Rating Connection Method Mounting Style Color Wire Gauge Min Wire Gauge Max Series
Phoenix Contact Power Distribution Blocks PTFIX 12X4 RD
185On Order
Min.: 1
Mult.: 1

Push-In Distribution Block 12 Position 32 A 630 V Push-In DIN Rail Red 24 AWG 10 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 12X4 WH
22Expected 25/09/2026
Min.: 1
Mult.: 1

Push-In Distribution Block 12 Position 32 A 630 V Push-In DIN Rail White 24 AWG 10 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 18X4 GN
8Expected 28/09/2026
Min.: 1
Mult.: 1

Push-In Distribution Block 18 Position 32 A 630 V Push-In DIN Rail Green 24 AWG 10 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 18X4 VT
8Expected 27/08/2026
Min.: 1
Mult.: 1

Push-In Distribution Block 18 Position 32 A 630 V Push-In DIN Rail Violet 24 AWG 10 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 10/12X4 WH
8Expected 29/10/2026
Min.: 1
Mult.: 1

Push-In White
Phoenix Contact Power Distribution Blocks PTFIX 10/18X4 GY
6Expected 17/08/2026
Min.: 1
Mult.: 1

Push-In Gray
Phoenix Contact Power Distribution Blocks PTFIX 10/18X4 RD
40On Order
Min.: 1
Mult.: 1

Push-In Red
Phoenix Contact Power Distribution Blocks PTFIX 10/12X4-G GY
8Expected 26/10/2026
Min.: 1
Mult.: 1

Push-In Gray
Phoenix Contact Power Distribution Blocks PTFIX 14X1,5-RZ OG
40On Order
Min.: 1
Mult.: 1
17.5 A Push-In Orange
Phoenix Contact Power Distribution Blocks PTFIX6/12X2,5NS35AVT 2.5mm2 w/6mm2 feedi 112Stock Available
Min.: 1
Mult.: 1

Distribution Block 13 Position 24 A 500 V Push-In DIN Rail (NS 35/7.5, NS 35/15) Violet 26 AWG 12 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 2X4 VT Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Violet
Phoenix Contact Power Distribution Blocks PTFIX 2X4 PK Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Pink
Phoenix Contact Power Distribution Blocks PTFIX 2X4-FE Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In
Phoenix Contact Power Distribution Blocks PTFIX 4/12X1,5 OG Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Orange
Phoenix Contact Power Distribution Blocks PTFIX 4/12X1 5-G BU Non-Stocked Lead-Time 7 Weeks
Min.: 1
Mult.: 1

Push-In Blue
Phoenix Contact Power Distribution Blocks PTFIX 4/18X1 5 VT Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Violet
Phoenix Contact Power Distribution Blocks PTFIX 4/18X1 5-NS35 WH Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Distribution Block 19 Position 17.5 A 500 V Push-In DIN Rail (NS 35/7.5, NS 35/15) White 26 AWG 14 AWG
Phoenix Contact Power Distribution Blocks PTFIX 4/18X1 5-NS35 VT Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Violet
Phoenix Contact Power Distribution Blocks PTFIX 4/18X1 5-NS35 PK Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Push-In Pink
Phoenix Contact Power Distribution Blocks PTRVB 8-FI /BN Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1
2 Push-In DIN Rail Gray
Phoenix Contact Power Distribution Blocks VIP-3/PT/PDM-2/32 Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Potential Distributor 8 A 250 V Push-In Green 26 AWG 14 AWG VIP-PT
Phoenix Contact Power Distribution Blocks PTFIX 12X1,5 PK 1.5mm2 adhesive mnt Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Distribution Block 12 Position 17.5 A 450 V Push-In Direct Mounting with Flange Pink 26 AWG 16 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 18X1,5-G BU 1.5mm2 adhesive mnt Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Distribution Block 18 Position 17.5 A 500 V Push-In Adhesive Blue 26 AWG 16 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 6X1,5-G VT 1.5mm2 adhesive mnt Non-Stocked Lead-Time 12 Weeks
Min.: 1
Mult.: 1

Distribution Block 6 Position 17.5 A 500 V Push-In Adhesive Violet 26 AWG 16 AWG PTFIX
Phoenix Contact Power Distribution Blocks PTFIX 6X2,5-NS35 WH 2.5mm2 NS35 DIN Trns Non-Stocked Lead-Time 10 Weeks
Min.: 1
Mult.: 1

Distribution Block 6 Position 24 A 500 V Push-In DIN Rail (NS 35/7.5, NS 35/15) White 26 AWG 12 AWG PTFIX